Pilot Project aims to optimise battery installation in the grid

Credit: r.classen/Shutterstock
Iberdrola and Multiverse Computing have successfully delivered a pilot project in northern Spain to optimise the installation of grid-scale batteries to ensure grid stability
Register for FREE to keep reading
Join 12,000+ scientists, engineers, and IT professionals driving innovation through informatics, HPC, and simulation with:
- Insights into HPC, AI, lab informatics & data
- Curated content for life sciences, engineering & academia
- Access to Breakthroughs: real-world computing success
- Free reports & panels, including the Lab Informatics Guide
- White Papers & software updates for smarter research
Sign up now
Already a member? Log in here
Your data is protected under our privacy policy.
